Shoalwater Bay

I3 infrasolutions has been involved in the supply and project support for Shoalwater Bay military base upgrade since construction first began in 2022. This complex upgrade 100km North of Rockhampton involved all areas of our supply scope from HV Switching, to low voltage power, to communications. In partnership with key manufacturers, i3 were able to provide project our major contractors specific and tailored solutions for their installs.

Throughout the project i3 has supplied over 200km of fibre and ethernet cable, thousands of meters of cable support systems and the key HV switching gear such as load banks, kiosks and RMUs.

  • Over 200,000M of fibre and ethernet cable
  • 40,000+ metres of power cable
  • 10,000+ metres of cable support systems
  • Key HV switching gear including load banks, kiosks & RMUs
over m
of fibre & ethernet cable
over km
of power cable
over m
of cable support systems
Scroll to Top